Deliv. N°
|
Deliverable title
|
Date |
|
D1.1.1
|
Synthetic description of performances and benefits of undergrounding transmission |
2009-12-17
|
| D1.2.1 |
Improving network controllability by Flexible Alternating Current Transmission System (FACTS) and by High Voltage Direct Current (HVDC) transmission systems |
2010-03-08 |
| D1.3.3 |
Comparison of AC and DC technologies for long-distance interconnections |
2010-03-19 |
|
D2.1
|
The model adopted for the scenario analyses. Structure and DataBase |
2009-05-27 |
D2.2
|
Energy services demand and scenario assessment
|
2009-11-25
|
| D3.1.1 |
Review of existing methods for transmission planning and for grid connection of wind power plants |
2009-06-15
|
| D3.2.1 |
Coordination Mechanisms, Tools and Load-Flow Issues of Cross-Border Transactions |
2009-12-22 |
| D3.2.2 |
Price, Cost and Financial Aspects of Network Extension in the European Context |
2010-04-27 |
| D3.3.1 |
Possible criteria to assess technical-economic and strategic benefits of specific transmission projects |
2010-04-29 |
Interim
|
Interim Report - Preliminary results on streamlining planning and approval procedures of electricity transmission infrastructures
|
2010-07-02
|